Projects
IBM
Location : Bromont, QC, Canada
Projects:
- Preliminary analysis on maintenance of all building infrastructure systems to identify improvement opportunities to maintain the same level of reliability while reducing preventive and corrective non-critical interventions.
- Reliability and criticality assessment of instrumentation and control equipments for the most critical building infrastructure systems.
- HVAC System Maintenance Program Optimization.
Horizon Milling
Location: Montreal, Qc, Canada
Project: Reliability and risk assessment of a power transformer to justify dismantle and replacement or refurbish.
Labatt Brewery
Location: Lasalle, QC, Canada
Project: Assessment of asset performance, and maintenance task efficiency of one Production Line.
Arcelor Mital
Location: Railroad Division, Port-Cartier, QC, Canada
Projects:
- Efficiency analysis of maintenance tasks performed on a locomotive fleet (AC4400).
- AC4400 locomotive Maintenance Program Optimisation
Location: Mont Wright Mine Division, Fermont, QC
Overall Performance assessment of a fleet of 230 tons 789 & 793 production trucks and a fleet of LT1800 loaders: Reliability, Availability, Risk assessment and Criticality Analyses; Production truck residual life assessment; Production truck’s tires life cycle analysis; Maintenance Task Efficiency assessment.
Location: Pellet plant Division, Port-Cartier, QC, Canada
- Reliability, Availability and Risk Assessmentof a 20 MVA electric boiler performance assessment to justify dismantle or refurbish.
- Performance assessment of the overall production line and coaching of an engineer in reliability analyses.
- Define an maintenance planning process based on a criticality criteria.
Alouette Aluminium
Location: Sept-Îles, QC, Canada
Reliability and Life cycle assessment for all DPAA critical components and identification of KPI
FEC (Federal Energy Commission of Mexico)
Location: Temascal Power Plant, Mexico
Project: Equipment Reliability, Availability and Criticality Analyses, and assessment of maintenance management process (Work identification; Work planning; Work scheduling; Work execution; Work follow-up).
Location: Caracol Power Plants, Mexico
Project: Equipment Reliability, Availability and Criticality Analyses, and assessment of maintenance management process (Work identification; Work planning; Work scheduling; Work execution; Work follow-up).
Ministerio de Minas & Energia
Location: URRA S.A. E.S.P., Colombia
Project: Assessment of asset performance, maintenance task criticality and efficiency and management process efficiency.